Cypr
Utwórz ogłoszenie

2-pokojowe Mieszkanie na sprzedaż, Dystrykt Limassol, Ipsonas

Opublikowano: 22 dni temu
ID: 167261
Ipsonas, Dystrykt Limassol, Cypr
  • Powierzchnia całkowita: 77 m²
  • Sypialnie: 2
  • Piętro: 3
€275 000

Numer referencyjny: 11336

This contemporary residential complex combines advanced construction technologies, ergonomic layouts, and a prime location. The project consists of five elegantly designed four- and five-story buildings, offering spacious, bright apartments crafted for comfort and functionality. Each residence is thoughtfully designed, featuring high-quality finishes. Living areas are adorned with ceramic flooring, while bedrooms offer the warmth of laminate surfaces. Large double-glazed windows ensure superior thermal and sound insulation, and generous terraces extend the living space, creating a perfect outdoor retreat. Modern elevators provide easy access to all floors, while a solar water heating system enhances energy efficiency. Built to the highest standards of safety and durability, the complex features earthquake-resistant structures and thermal insulation. Residents benefit from private storage rooms, designated parking areas, and a secure video intercom system for enhanced security. Located in the thriving district of Ypsonas, the development provides convenient access to key urban amenities, including schools, shopping centers, and transport links. This residential quarter is an excellent choice for those who appreciate quality, comfort, and a well-designed living environment in one of Limassol’s most dynamic areas.
Tłumaczenie na polski

Główne parametry

Efektywność energetyczna
a
Powierzchnia zabudowana
98 m²
Zadaszona weranda
21 m²
Łączna powierzchnia
77 m²
Liczba pięter
4
Sypialnie
2
Piętro
3
Umeblowanie
Nie
Ogrzewanie
Tak
Kuchnia
Nie

Infrastruktura

  • Zadaszone miejsce parkingowe

Lokalizacja

Interaktywna mapa pokazująca obszar wokół nieruchomości. szerokości 34.689556 i długości 32.971928 Promień: 0.5 km Użyj przycisków plus i minus, aby przybliżać i oddalać.