Cyprus
Create listing

Detached House for sale, Limassol, Agios Tychon, Dimos Amathountas

Posted: 1 year ago
ID: 91550
Agios Tychon, Limassol, Cyprus
  • Total area: 255 m²
  • Bedrooms: 3
  • Bathrooms: 2
€1 450 000

Reference number: 128945

Luxury 3 bedroom villa for sale in the off plan stage in an elite complex in Agios Tychonas, Limassol. Large swimming pool in a landscaped garden. Sunny terraces with a bar and outdoor seating areas. Covered parking. The villa is designed in such a way as to maximize the use of light and space and is finished with the most modern high-quality materials and fittings.

Translate into English

Main Parameters

Building condition
Renovated
Energy efficiency
a
Total area
255 m²
Bedrooms
3
Furnishing
No
Balcony
No
Kitchen
Yes
Electricity
Yes
Gas
No
Bathrooms
2
Air conditioning
No
Property status
New build

Infrastructure

  • Parking place
  • Swimming pool

Amenities

  • Modern design

Additional

  • Best price
DOM Cyprus avatar
DOM Cyprus

Location

Interactive map showing the area around the property. latitude 34.725065145144576 and longitude 33.138638391452595 Radius: 1 km Use the plus and minus buttons to zoom in and out.