Cyprus
Create listing

Apartment for sale, Limassol, Agios Nicolaos

Posted: 7 months ago
ID: 73755
Limassol, Cyprus
  • Total area: 75 m²
  • Bedrooms: 2
  • Bathrooms: 2
€440 000

Reference number: 7446

•2 bedrooms •2 W/C •Internal Area 75m2 •Covered Verandas 18m2 •Covered Parking •Storage •Photovoltaic Panels •Close to several amenities •6 minutes to the sea
Translate into English

Main Parameters

Energy efficiency
a
Covered veranda
18 m²
Total area
75 m²
Bedrooms
2
beds
2
Electricity
Yes
Bathrooms
2

Infrastructure

  • Parking place
  • Storage

Location features

  • Near the sea
  • City center
  • Calm district

Amenities

  • Modern design
  • Photovoltaic provisions
Kadis Estates avatar
Kadis Estates

Location

Interactive map showing the area around the property. latitude 34.6927253 and longitude 33.0577984 Radius: 1 km Use the plus and minus buttons to zoom in and out.