Apartment for sale, Larnaca, Aradippou
- Total area: 50 m²
- Bathrooms: 1
Reference number: 48249
Amazing, Second floor, One-Bedroom apartment for Sale in Krasas Area, Larnaca. Only 2 km away from the new Larnaca Metropolis Mall. Close to all amenities such as schools, supermarkets, banks, bakeries, pharmacy bus service etc. A 10-minite drive to Larnaca Town Center, the harbor and the beach. Easy access to Larnaca, Nicosia, Ayia Napa motorway without getting delayed in traffic.
Apartment for sale in Krasas area, Larnaca. Situated on the second floor, this apartment boasts 50 sq.m. of internal covered space and an additional 11 sq.m. covered veranda. The layout includes 1 bedroom, an open-plan kitchen, living, and dining area, and a main bathroom. The covered veranda provides an excellent outdoor space, while the property also includes covered parking and storage area on the ground floor.
This apartment is part of a modern residential project in Krasas, comprising 3 one-bedroom and 6 two-bedroom apartments. The contemporary design focuses on detail and ensures privacy for residents. The project is adjacent to a green area, offering a peaceful environment. The area of the property is characterized as quiet and residential.
Extra: Elevator, Covered Parking space, Storage, Energy Efficiency A, Provision A/C
Interactive map showing the area around the property. latitude 34.90336121928672 and longitude 33.58509774205321 Radius: 1 km Use the plus and minus buttons to zoom in and out.
Select your preferred language. The page will reload in the selected language.